| 15' x 12' x 18' ID Manhole |
|
|
|
|
|
Dow-Cargill Polymer Project, Blair, NE.
|
|
|
 |
| 20' x 12' x 8' Electric Power Manhole |
|
|
|
|
| 5-sided structure, approximate weight 80,000
pounds |
|
|
| Kansas Power & Light Company, |
| Topeka, Kansas |
 |
| 12' x 10' x 8' Electric Power Manhole |
|
|
|
|
| 4-sided structure, approximate weight 50,000
pounds |
|
|
| Kansas Power & Light Company, |
| Topeka, Kansas |
 |
| 6' x 6' x 6'-4" ID Manhole |
|
|
|
|
| Kansas City International Airport, Kansas City,
MO. |
|
|
 |
| 10' x 10' x 8' ID Manholes |
|
|
|
|
| Missouri Public Service, Substation, Kansas
City, MO. |
|
|
 |
| 14' x 8' x8' ID Manholes (8 Sided Geometry) |
|
|
|
|
| NASCAR Speedway, Kansas City, Kansas |
|
|
 |
| 18' x 14' x 8' ID Manholes (12 Sided
Geometry) |
|
|
|
|
| NASCAR Speedway, Kansas City, Kansas |
|
|
 |
| Sprint Corporation World Headquarters,
Overland Park, KS. |
|
|
|
|
| 6' x 6' x 6'-4" ID Manholes |
|
|
 |
| 6' x 6' x 6' ID Manholes |
|
|
|
|
| University of Kansas, Elec. Dist. System Upgrade,
Lawrence, KS. |
|
|
 |
| 10' x 6' x 6' ID Manholes |
|
|
|
|
| University of Kansas, Elec. Dist. System Upgrade,
Lawrence, KS. |
|
|
 |
| 22' x 14.5' x 8' Electric Power Manholes |
|
|
|
|
| Grand Blvd. Electric Distribution System |
|
|
| Unified Governments Tourism District, |
| Kansas City, Kansas |
 |
| 29' x 23' x 8' Tandem Cell Transformer Vault |
|
Inquire
|
|
|
Conduit penetration through base with provision
for elevated transformer pad as secondary pour
|
|
|
| Nebraska Furniture Mart |
|
|
| NASCAR Tourism District, Kansas City, Kansas |
|
|
 |
| Exira, Iowa, new gas-fired generating station. |
|
Inquire
|
|
|
Various large manholes with extensive conduit duct terminators.
|
|
|
 |
Deep 22’ x 14.5’ x 8’ ID Manhole (12 Sided
Geometry)
|
|
Inquire
|
|
|
Design depth of fill 25’
|
|
|
| to intercept bore under a culvert |
|
|
 |
Tandem 10’ x 10’ x 8’ ID Manholes,
|
|
Inquire
|
|
|
| Aquila Turner Road Substation |
|
|
| Belton, Missouri |
|
|
 |
23 x 12 Switchgear Manhole w/integrated retaining wall
|
|
Inquire
|
|
|
| Installed in KDOT right-of-way |
|
|
| I-435 and France Family Dr. |
|
|
 |